Joj
Member
- Joined
- Jan 10, 2022
- Member Type
- Student or Learner
- Native Language
- Arabic
- Home Country
- Lebanon
- Current Location
- France
I would greatly appreciate it if someone could fix any errors in the following email:
Dear client,
Please find below a 3D rendering images of the structure that will installed on your roof.
Additionally, I’ve included a video animation of the construction from all angles.
For the primary component of the structure, we are employing 120x60mm, while the secondary beams are 40x40mm in size. Galvanized steel is utilized.
As can be seen in the image, the structure is supported by two places: the main one is the concrete slab in the wall, and the other is the parapet.
We will drill holes in the wall and parapet, but we will follow up the drilling with a waterproofing injection to preserve the current structure.
As requested, a 15 cm gap will be left open to allow water to enter the building's roof.
Dear client,
Please find below a 3D rendering images of the structure that will installed on your roof.
Additionally, I’ve included a video animation of the construction from all angles.
For the primary component of the structure, we are employing 120x60mm, while the secondary beams are 40x40mm in size. Galvanized steel is utilized.
As can be seen in the image, the structure is supported by two places: the main one is the concrete slab in the wall, and the other is the parapet.
We will drill holes in the wall and parapet, but we will follow up the drilling with a waterproofing injection to preserve the current structure.
As requested, a 15 cm gap will be left open to allow water to enter the building's roof.